粉嫩av-欧美老熟妇又粗又大-亚洲欧美天堂-91精品久久久久久久-日本少妇一区二区-成人在线黄色-伊人青草-奇米成人影视-国产亚洲精品熟女国产成人-天天草天天操-天天射干-四虎国产精品永久在线国在线-欧美日韩在线播放三区四区-亚洲人在线视频-喷潮在线

Current Location:Home > Product > IF induction series > IF power supply

2018-10-26 10:13:27

Share
  • Share to WeChat Moments

RAZ-400KW intermediate frequency power supply---+---furnace shelf (combination)

  • Description

Induction Heating Power Supply--Safety Operation Guide


1. Before starting the machine, first check whether the water, gas and electricity are connected. After connecting, the following operations can be performed;

2. The operator must prepare corresponding insulating shoes, gloves, etc.

3. The operator must have the corresponding electrical knowledge.

4. Before the equipment is overhauled, the electric switch must be pulled off to confirm that the power supply is disconnected, and then the discharge treatment is carried out, and then the overhaul card is hung up, and the overhaul is repeated.

5. Before starting the machine, first make sure that the waterway is normal and all parts of the equipment are normal before starting the machine.

6. Turn on the first gear filament first, then turn on the second gear filament after five minutes, and then send the high voltage after another five minutes.

7. Before sending high voltage, make sure that the output adjustment potentiometer is in a small position, and then send high voltage, and adjust the output voltage to the working voltage.

8. After confirming that there is a workpiece, you can press the heating button to make the equipment work, but no-load heating is not allowed.

9. If there is an abnormality in the equipment during work, the power supply must be disconnected immediately, and the reason should be checked before working again.

10. After the equipment is finished working, first disconnect the heating, then disconnect the high voltage, then turn off the filament and disconnect the power supply.

11. After the equipment stops working, wait for five minutes before disconnecting the water source.

12. During the operation of the equipment, if there is a temporary need to leave, it must be done. People leave the machine and stop it. It is not allowed. The machine is still working when there is no one.


weekly maintenance

1. When taking over the shift, check the flow of the cooling water outlet pipe of the equipment for abnormal phenomena. For equipment that uses evaporative cooling tubes, it is necessary to check whether the water level of the distilled water tank is qualified;

2. When taking over, check whether the cooling air volume of the glass shell and core column of the electronic tube and other ventilation and heat dissipation facilities are normal;

3. Check whether the contacts of each AC contactor are ablated and whether the wiring is loose;

4. Measure the insulation resistance of cooling water. The ground resistance of the anode of the water-cooled tube should be greater than 300K ohms;

5. The cooling water pipes of the electronic tube grid and the filament are mostly rubber tubes, which are easy to age and should be carefully checked. For the rubber tube that is aging and about to break, it should be updated in time;

6. Do a cleaning and dust removal on the inside of the chassis, wipe off the dust of each high-pressure porcelain bottle and insulating pillars, and pay attention to the cleaning of the dust filter on the air inlet of the fan. Prevent the air intake from being blocked and reduce the air output.


Semi-annual maintenance

1. Check whether the insulation performance of the low-voltage electric control circuit is qualified;

2. Use a megohmmeter to detect the insulation resistance of high-voltage devices such as high-voltage rectifier transformers, high-voltage cables, and high-voltage silicon stacks, and the value should meet the requirements;

3. Check the roundness of the inner tube of the water jacket of the electronic tube and the height of the positioning protrusion, so as to prevent the partial overheating of the anode caused by the deviation of the tube. And check whether there is scaling at the water jacket outlet and inlet pipe joints, and whether the anti-corrosion electrode is normal; 4. Check the set current value of each overcurrent relay;

5. For connecting conductors with high temperature during operation, such as filament lead wires, soft connecting wires for welding transformer primary coils, etc., if there is poor oxidation contact, additional treatment should be made;

7. Thoroughly clean the hidden places such as the top of the cabinet and the cable trench.


Link to this article:http://www.mortgage-hk.com/en/product/product20181026142.html
Previous:NO!
Next:NO!

Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 日韩精品久久久久久 | 日本韩国欧美一区二区 | 日韩成人免费在线视频 | 天天天综合网 | 天天操天天操天天操天天 | 天天色天 | 亚洲高清免费视频 | 懂色av懂色av粉嫩av分享吧 | 内射合集对白在线 | 久久精品国产亚洲AV无码男同 | 激情插插插 | 欧美黄色一区二区三区 | 日本h视频在线观看 | 在线播放av网址 | 日韩黄色片网站 | av男人的天堂在线 | 中文字幕在线观看免费视频 | 冲田杏梨一区二区三区 | 男女久久久 | 黄色国产精品 | 麻豆短视频在线观看 | 成人欧美一区二区三区黑人孕妇 | 午夜影院在线观看视频 | 国产精品一区二区av日韩在线 | 黑人性生活视频 | 手机av在线| 成人h动漫在线 | 久热国产在线 | 美女三级黄色片 | 国产91精品ai换脸 | 99久久精品国产成人一区二区 | 疯狂少妇| 午夜精品久久久久久久久久久久 | 日本在线观看免费 | 成人91看片| 亚洲理论在线观看 | 精品一区二区三区四区五区 | 福利网站在线 | av狠狠干 | 伊人激情| 男人视频网 | 在线高清免费观看 | 想要xx在线观看 | 欧美日韩亚洲综合 | 欧美草b | 亚洲一区在线视频 | 成人做爰69片免费看 | av动态| 久久亚洲精华国产精华液 | 免费的黄网站 | 日本少妇xxxx| 1000部国产精品成人观看 | 九色福利 | 99久久婷婷国产精品综合 | 青青草视频污 | 最新中文字幕在线播放 | 婷婷九月丁香 | 亚洲人体一区 | 一区二区三区四区五区视频 | 欧美日韩亚洲第一 | 天天天色 | 又大又粗欧美黑人aaaaa片 | 成人福利视频导航 | 久久综合影视 | 亚洲第一页av | 欧美少妇一区二区三区 | 久久露脸国语精品国产91 | 国产免费无码一区二区视频 | 少妇人妻偷人精品一区二区 | 免费观看污视频 | 国产精品久久久久久亚洲毛片 | 成人免费在线观看av | 悠悠av| 视频网站在线观看18 | 色图社区 | 金瓶狂野欧美性猛交xxxx | 91蜜桃视频| 韩国女主播裸体摇奶 | 神马久久久久久久 | 日本精品在线 | 亚洲乱轮 | 国产精品久线在线观看 | 婷婷激情五月综合 | 床戏高潮做进去大尺度视频 | 国产成人自拍一区 | 日本东京热一区二区三区 | 91精品黄色| 亚洲奶汁xxxx哺乳期 | av大全免费观看 | 亚洲xxxxxx | 欧美三级一级 | 欧美人与动物xxx | 一级黄色大片免费观看 | 免费在线观看黄色网址 | 少妇高潮一区二区三区69 | 制服丝袜在线第一页 | 欧美精品免费在线观看 | 日本熟妇毛茸茸丰满 | 噜噜视频|