RAZ-400KW intermediate frequency power supply---+---furnace shelf (combination)

  • Description

Induction Heating Power Supply--Safety Operation Guide


1. Before starting the machine, first check whether the water, gas and electricity are connected. After connecting, the following operations can be performed;

2. The operator must prepare corresponding insulating shoes, gloves, etc.

3. The operator must have the corresponding electrical knowledge.

4. Before the equipment is overhauled, the electric switch must be pulled off to confirm that the power supply is disconnected, and then the discharge treatment is carried out, and then the overhaul card is hung up, and the overhaul is repeated.

5. Before starting the machine, first make sure that the waterway is normal and all parts of the equipment are normal before starting the machine.

6. Turn on the first gear filament first, then turn on the second gear filament after five minutes, and then send the high voltage after another five minutes.

7. Before sending high voltage, make sure that the output adjustment potentiometer is in a small position, and then send high voltage, and adjust the output voltage to the working voltage.

8. After confirming that there is a workpiece, you can press the heating button to make the equipment work, but no-load heating is not allowed.

9. If there is an abnormality in the equipment during work, the power supply must be disconnected immediately, and the reason should be checked before working again.

10. After the equipment is finished working, first disconnect the heating, then disconnect the high voltage, then turn off the filament and disconnect the power supply.

11. After the equipment stops working, wait for five minutes before disconnecting the water source.

12. During the operation of the equipment, if there is a temporary need to leave, it must be done. People leave the machine and stop it. It is not allowed. The machine is still working when there is no one.


weekly maintenance

1. When taking over the shift, check the flow of the cooling water outlet pipe of the equipment for abnormal phenomena. For equipment that uses evaporative cooling tubes, it is necessary to check whether the water level of the distilled water tank is qualified;

2. When taking over, check whether the cooling air volume of the glass shell and core column of the electronic tube and other ventilation and heat dissipation facilities are normal;

3. Check whether the contacts of each AC contactor are ablated and whether the wiring is loose;

4. Measure the insulation resistance of cooling water. The ground resistance of the anode of the water-cooled tube should be greater than 300K ohms;

5. The cooling water pipes of the electronic tube grid and the filament are mostly rubber tubes, which are easy to age and should be carefully checked. For the rubber tube that is aging and about to break, it should be updated in time;

6. Do a cleaning and dust removal on the inside of the chassis, wipe off the dust of each high-pressure porcelain bottle and insulating pillars, and pay attention to the cleaning of the dust filter on the air inlet of the fan. Prevent the air intake from being blocked and reduce the air output.


Semi-annual maintenance

1. Check whether the insulation performance of the low-voltage electric control circuit is qualified;

2. Use a megohmmeter to detect the insulation resistance of high-voltage devices such as high-voltage rectifier transformers, high-voltage cables, and high-voltage silicon stacks, and the value should meet the requirements;

3. Check the roundness of the inner tube of the water jacket of the electronic tube and the height of the positioning protrusion, so as to prevent the partial overheating of the anode caused by the deviation of the tube. And check whether there is scaling at the water jacket outlet and inlet pipe joints, and whether the anti-corrosion electrode is normal; 4. Check the set current value of each overcurrent relay;

5. For connecting conductors with high temperature during operation, such as filament lead wires, soft connecting wires for welding transformer primary coils, etc., if there is poor oxidation contact, additional treatment should be made;

7. Thoroughly clean the hidden places such as the top of the cabinet and the cable trench.


Link to this article:http://www.mortgage-hk.com/en/product/product20181026142.html
Previous:NO!
Next:NO!

Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 91丝袜一区在线观看 | 91中文在线| 亚洲aⅴ在线 | 亚洲精品字幕 | 欧美草逼网 | 国产一区二区中文字幕 | 黑白配在线观看免费观看 | 成人网在线看 | 青青99| 精品无码国产一区二区三区51安 | 国产天天骚 | 日本亚洲黄色 | 日本黄色三级 | 日韩中文av| 成年网站在线视频网站 | 成人免费视频大全 | 日韩精品人妻中文字幕 | 免费在线看黄网址 | 色之久久综合 | 国产精品一二三四五 | 午夜伦理在线观看 | 免费播放av | 国产精品九色 | 奇米亚洲| 特级做a爱片免费69 国产午夜一区二区三区 | 人妻熟女一区二区三区 | 亚洲一区二区福利 | 国产成人精品123区免费视频 | 日韩精品视频免费在线观看 | 亚洲爆乳无码一区二区三区 | 中文字幕国产精品 | 亚洲av综合色区无码一区爱av | 天天干,夜夜爽 | 亚洲精品一区二 | 色老头一区二区三区在线观看 | 国精品一区 | 又大又硬又爽免费视频 | 麻豆国产尤物av尤物在线观看 | 国产精品福利片 | 免费观看全黄做爰的视频 | 日日日插插插 | 91国视频 | 亚洲av成人片色在线观看高潮 | 91黄视频在线观看 | 久久精品aⅴ无码中文字字幕重口 | 日本人极品人妖高潮 | 91黄色免费视频 | 亚洲国产精品福利 | 男女啪啪网站免费 | 成人一级网站 | 色播视频在线播放 | 国内精品国产成人国产三级 | 久久大香| 91视频在线免费观看 | 国产在线观看免费视频今夜 | 欧美成人a视频 | 国产成人精品在线播放 | 免费的一级片 | 四虎在线视频 | 蜜桃久久一区二区三区 | 国产视频在线一区二区 | av久久久久久| 久久久久久久久99 | 日韩特级黄色片 | 中日韩av在线 | 天堂网在线观看 | 玖玖爱av| 日本免费黄色小视频 | 欧美亚洲三级 | 青青草国产一区二区三区 | 精品国产伦一区二区三区 | 日韩久久视频 | 91毛片网| 国产成人久久精品麻豆二区 | 一级片中文 | 亚洲精品资源在线 | www.日韩欧美 | 久久久久国产一区二区 | 久久8| 日韩理论片在线观看 | 久久午夜精品人妻一区二区三区 | 亚洲国产精品99久久久久久久久 | 老地方在线观看免费动漫 | 国产精品v亚洲精品v日韩精品 | 我们俩电影网mp4动漫官网 | 五月婷婷网 | 免费在线你懂的 | 欧美日韩成人在线 | 午夜精品久久久久久久久久 | 激情片网站 | 亚洲美女爱爱 | 午夜久久精品 | 中文字幕一区二区人妻 | 日韩中文在线播放 | 国产无套丰满白嫩对白 | 国模人体私拍xvideos | 72成人网| 亚洲免费资源 | 性色欲网站人妻丰满中文久久不卡 |