Current Location:Home > Product > High frequency induction heating series > High frequency heating machine

2019-10-12 13:38:26

Share
  • Share to WeChat Moments

RAC-40kw high frequency heating machine

  • Description

1. Main application

 1. Application of ribbed induction annealing production line;

 2. Heating and burning through the hot upsetting production line of round steel bar and steel column;

 3. Induction heating of square steel;

 4. The diathermy of the whole iron rod;

 5. Red forging of standard parts (nuts and bolts);

 6. Partial through-fire forging forming of pipes;

 7. Hot forging of cold-drawn solid section steel, hot upsetting of the tie head of cold-drawn seamless steel pipe;

 8. Induction hot upsetting of drill pipe ends;

 9. Heating forging of automobile maintenance tools (socket wrenches);

 10. Heating, stamping and bending of high-voltage power transmission and power line tower angle steel plates;

 11. On-line warm upsetting forging of copper bars;

 12. The application of heating and warm upsetting in the hot upsetting production line of the automatic steel ball and steel column upsetting machine.

 13. Hot forging of rivets, spring bars and road studs for railway accessories

 14. Heating of supporting accessories such as circlips and U-shaped cables;

 15. Heating ears of leaf springs, etc.

 

2. Main Features

1. Using IGBT power devices and our company's second-generation converter control technology, the equipment has higher reliability and lower maintenance costs;

2. Full load continuous rate, 24 hours operation;

3. With constant current/constant power control function, the heating efficiency is higher;

4. Full display of output power, frequency and current;

5. The installation is simple, only need to connect electricity and water to use, no need to install by special personnel;

 

3. Installation method

1. Place the main and auxiliary machines: Generally, the main machine (operation control machine) is placed on the top, and the auxiliary machine (power output machine) is placed at the bottom.

2. Connect the water and electricity of the main and auxiliary machines: Use the two thin water pipes in the accessories to connect the waterway in a straight up and straight down way. Then use the two cables in the accessories, red to red and black to black to connect the circuit. It must be tightened, and there should be no poor contact. Connect the ground wire of the main and auxiliary machines.

3. Power connection: This machine is a three-phase power supply mode (380V), and the three red wires are respectively connected to a special three-phase switch or air switch (above 65A). Reconnect the ground wire.

4. Water connection: The cooling water pressure used by this machine is 0.1Mpa-0.3Mpa. Please choose a 1.1KW water pump and a water tank or pool (the water pump should be selected according to the length of the distance, and the larger water pump should be selected for the long distance; the volume should be selected according to the continuous working time and workload, and a small cooling tower can be installed if necessary). The water outlet of the pump is connected to the water inlet of the machine with a water pipe, and the water outlet of the machine returns the return water to the pool with a water pipe to realize water circulation cooling.

5) Install the induction coil: According to the shape and size of the heated metal workpiece, select, install and fix the induction coil. Note that the induction coil cannot be short-circuited.

6. Putting the workpiece: Put the workpiece to be heated into the center of the induction coil, the surrounding gap should be basically the same, and the workpiece and the induction coil should not touch.

 

4. Operation steps

1. Water: Start the water pump and observe whether the water flow at the water outlet is normal.

2. Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3. Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4. Start: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5. Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6. Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7. Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch at the rear of the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!

 

5. Maintenance

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

 

6. Technical parameters

 

model

RAC-40KW

Output Power

40KW

Input voltage

380v 50hz

Oscillation frequency

10-30khz

Pump Specifications

750w

Cooling tower water flow

10T/Hour

pool

1cube

transformer

50KW

copper wire

10square

 

Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 欧美a网站| 国产成人精品无码播放 | 男人舔女人下部高潮全视频 | 蜜臀久久99精品久久久画质超高清 | 欧美视频xxx | 亚洲AV无码一区二区三区性 | 久久综合久久综合久久综合 | 农村妇女一区二区 | 涩涩涩在线视频 | 淫五月| 精品毛片| a免费在线 | 激情视频一区二区三区 | 欧美日韩在线观看视频 | 调教亲女小嫩苞h文小说 | 亚洲三级小说 | 美国黄色一级视频 | 日韩免费专区 | 上原亚衣在线 | 日韩一区二区免费在线观看 | 超碰精品在线观看 | 大地资源二中文在线影视免费观看 | 国产aaa级片| 久久成人一区 | 我要看一级片 | 激情网站免费 | 亚洲爱情岛论坛永久 | 欧亚av在线 | 色婷婷亚洲综合 | 国产a国产片 | 国产盗摄一区二区三区在线 | 成人在线免费av | 人妻精品一区二区在线 | 日韩在线观看免费全 | 蜜桃精品久久久久久久免费影院 | 91亚洲精品一区二区乱码 | 视频一区二区在线播放 | 欧美日韩中文在线 | 精品国产中文字幕 | 极品少妇在线观看 | 色婷婷狠狠干 | 精品黑人一区二区三区观看时间 | 人人艹人人 | avav国产 | 91手机视频在线观看 | 影音先锋成人资源 | 天天操婷婷| 久久国语 | 中文字幕一区二区久久人妻网站 | 欧美日韩一区二区在线视频 | 日本欧美www | 精品人伦一区二区三区蜜桃免费 | 久久嫩草 | 欧美男女视频 | 午夜av网站 | 日韩精品中文字幕一区 | 熟妇的味道hd中文字幕 | 欧美一级片a | 亚洲精品粉嫩小泬20p | 97人妻一区二区精品视频 | 超碰人人艹 | 中文字幕免费av | 免费观看一级黄色片 | 国产精品无码久久久久久 | 俺来也在线视频 | 91免费影片 | 91亚洲免费| 日韩3p| 亚洲图片在线播放 | 国产毛片毛片毛片毛片 | 亚洲国产伊人 | 亚洲在线中文字幕 | 中文字幕最新 | 欧美乱大交xxxxx | 蜜臀av无码精品人妻色欲 | 黄色一级大片在线免费看产 | 中文字幕69 | 在线观看成年人视频 | 国产在线观看免费视频软件 | 自拍偷拍福利视频 | 欧美性生交xxxxx久久久缅北 | 欧美高清videos高潮hd | 久久久久无码国产精品一区李宗瑞 | 久久久黄色片 | 榴莲视频黄色 | 久草中文在线观看 | 女人18毛片一区二区三区 | 久久综合影院 | 水牛影视av一区二区免费 | 一色屋免费视频 | 天天综合天天干 | 永久免费av在线 | 精品国产一区二区三区久久狼黑人 | 欧美成欧美va | av色网站 | 精品动漫一区二区三区在线观看 | 992在线观看 | 国产欧美一区二区三区在线 | 91精品91久久久中77777 |