粉嫩av-欧美老熟妇又粗又大-亚洲欧美天堂-91精品久久久久久久-日本少妇一区二区-成人在线黄色-伊人青草-奇米成人影视-国产亚洲精品熟女国产成人-天天草天天操-天天射干-四虎国产精品永久在线国在线-欧美日韩在线播放三区四区-亚洲人在线视频-喷潮在线

Current Location:Home > Product > High frequency induction heating series > High frequency heating machine

2019-10-12 14:05:09

Share
  • Share to WeChat Moments

RAC-120KW high frequency heating machine

  • Description

1. Main application

 1. Application of ribbed induction annealing production line;

 2. Heating and burning through the hot upsetting production line of round steel bar and steel column;

 3. Induction heating of square steel;

 4. The diathermy of the whole iron rod;

 5. Red forging of standard parts (nuts and bolts);

 6. Partial through-fire forging forming of pipes;

 7. Hot forging of cold-drawn solid section steel, hot upsetting of the tie head of cold-drawn seamless steel pipe;

 8. Induction hot upsetting of drill pipe ends;

 9. Heating forging of automobile maintenance tools (socket wrenches);

 10. Heating, stamping and bending of high-voltage power transmission and power line tower angle steel plates;

 11. On-line warm upsetting forging of copper bars;

 12. The application of heating and warm upsetting in the hot upsetting production line of the automatic steel ball and steel column upsetting machine.

 13. Hot forging of rivets, spring bars and road studs for railway accessories

 14. Heating of supporting accessories such as circlips and U-shaped cables;

 15. Heating ears of leaf springs, etc.

 

2. Main Features

1. Using IGBT power devices and our company's second-generation converter control technology, the equipment has higher reliability and lower maintenance costs;

2. Full load continuous rate, 24 hours operation;

3. With constant current/constant power control function, the heating efficiency is higher;

4. Full display of output power, frequency and current;

5. The installation is simple, only need to connect electricity and water to use, no need to install by special personnel;

 

3. Installation method

1. Place the main and auxiliary machines: Generally, the main machine (operation control machine) is placed on the top, and the auxiliary machine (power output machine) is placed at the bottom.

2. Connect the water and electricity of the main and auxiliary machines: Use the two thin water pipes in the accessories to connect the waterway in a straight up and straight down way. Then use the two cables in the accessories, red to red and black to black to connect the circuit. It must be tightened, and there should be no poor contact. Connect the ground wire of the main and auxiliary machines.

3. Power connection: This machine is a three-phase power supply mode (380V), and the three red wires are respectively connected to a special three-phase switch or air switch (above 65A). Reconnect the ground wire.

4. Water connection: The cooling water pressure used by this machine is 0.1Mpa-0.3Mpa. Please choose a 1.1KW water pump and a water tank or pool (the water pump should be selected according to the length of the distance, and the larger water pump should be selected for the long distance; the volume should be selected according to the continuous working time and workload, and a small cooling tower can be installed if necessary). The water outlet of the pump is connected to the water inlet of the machine with a water pipe, and the water outlet of the machine returns the return water to the pool with a water pipe to realize water circulation cooling.

5) Install the induction coil: According to the shape and size of the heated metal workpiece, select, install and fix the induction coil. Note that the induction coil cannot be short-circuited.

6. Putting the workpiece: Put the workpiece to be heated into the center of the induction coil, the surrounding gap should be basically the same, and the workpiece and the induction coil should not touch.

 

4. Operation steps

1. Water: Start the water pump and observe whether the water flow at the water outlet is normal.

2. Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3. Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4. Start: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5. Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6. Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7. Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch at the rear of the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!

 

5. Maintenance

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

 
6. Technical parameters

model

RAC-120KW

Output Power

120KW

Input voltage

380v 50hz

Oscillation frequency

10-30khz

Pump Specifications

2.2kw

Cooling tower water flow

15T/Hour

pool

2cube

transformer

50KW

copper wire

50square

 

Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 女性向片在线观看 | 秋霞av影院 | 中文字幕电影一区 | 修仙淫交(高h)h文 | 欧美乱妇狂野欧美在线视频 | 欧美a免费| 国内外成人免费视频 | 亚洲免费观看av | 老熟女高潮一区二区三区 | 久久综合色婷婷 | 中文字幕在线一区 | 又色又爽又黄18网站 | 中文字幕99 | 一道本视频在线 | 成年视频在线观看 | 韩国无码一区二区三区精品 | 国产精品国产三级国产 | 69超碰 | 亚洲制服av | 久久久久久久一区 | 欧美人与性囗牲恔配 | 麻豆伦理片 | 捆绑最紧bdsm视频 | 秋霞福利网 | 久久免费视频观看 | 99黄色| 庆余年三 | 国精无码欧精品亚洲一区蜜桃 | 蜜桃视频成人 | 最近中文字幕在线观看 | 成人欧美一区二区三区黑人一 | 成人黄色免费在线观看 | 中文字幕亚洲欧美日韩 | 久久久久国产精品一区二区 | 99热这里只有精品66 | 精品美女久久久久 | 国产精品欧美亚洲 | 亚洲精品久久久久久久久久久久久 | 亚洲欧洲成人 | 综合一区 | 久久久久久无码精品大片 | 国产清纯白嫩初高中在线观看性色 | 一区二区三区播放 | 精品97人妻无码中文永久在线 | eeuss一区二区三区 | 人妖黄色片| 久热精品在线观看视频 | 成人hd| 欧美三根一起进三p | 庆余年三 | 久久国产主播 | 在线观看黄色大片 | 91午夜影院 | sese在线视频 | 亚洲乱码国产乱码精品精大量 | 国产精品suv一区二区69 | 成人激情电影在线观看 | sm调教羞耻姿势图片 | 爱爱的网站 | 国产精品推荐 | 91人妻一区二区三区 | 欧美激情片在线观看 | 久久久免费观看视频 | 怡红院亚洲 | 亚洲一区二区日本 | 在线免费观看一级片 | 欧美激情图片 | 浪浪视频在线观看 | 亚洲精品在线免费观看视频 | 欧美日韩在线网站 | 中文字幕2区 | 一本大道av伊人久久综合 | 国产精品黄色大片 | 成人av免费在线播放 | 91破处视频 | 免费人成网站 | 91九色蝌蚪在线 | 老子午夜影院 | 久久视频精品在线 | 亚洲成a人| 亚洲暴爽 | 999伊人| 欧美freesex黑人又粗又大 | 成人高清视频在线观看 | 狠狠干在线| 少妇婷婷 | 成人午夜影院在线观看 | 欧美精品久久久久a | www.成人在线 | 亚洲国产成人综合 | 国产免费黄网站 | 天天综合天天做天天综合 | 国产欧美又粗又猛又爽 | 国产精品永久久久久久久久久 | 久久这里有精品 | 国产97色在线 | 法国经典free性复古xxxx | gogo人体做爰大胆视频 | 欧美日韩你懂的 |