粉嫩av-欧美老熟妇又粗又大-亚洲欧美天堂-91精品久久久久久久-日本少妇一区二区-成人在线黄色-伊人青草-奇米成人影视-国产亚洲精品熟女国产成人-天天草天天操-天天射干-四虎国产精品永久在线国在线-欧美日韩在线播放三区四区-亚洲人在线视频-喷潮在线

Current Location:Home > Product > High frequency induction heating series > High frequency heating machine

2019-10-12 14:05:09

Share
  • Share to WeChat Moments

RAC-120KW high frequency heating machine

  • Description

1. Main application

 1. Application of ribbed induction annealing production line;

 2. Heating and burning through the hot upsetting production line of round steel bar and steel column;

 3. Induction heating of square steel;

 4. The diathermy of the whole iron rod;

 5. Red forging of standard parts (nuts and bolts);

 6. Partial through-fire forging forming of pipes;

 7. Hot forging of cold-drawn solid section steel, hot upsetting of the tie head of cold-drawn seamless steel pipe;

 8. Induction hot upsetting of drill pipe ends;

 9. Heating forging of automobile maintenance tools (socket wrenches);

 10. Heating, stamping and bending of high-voltage power transmission and power line tower angle steel plates;

 11. On-line warm upsetting forging of copper bars;

 12. The application of heating and warm upsetting in the hot upsetting production line of the automatic steel ball and steel column upsetting machine.

 13. Hot forging of rivets, spring bars and road studs for railway accessories

 14. Heating of supporting accessories such as circlips and U-shaped cables;

 15. Heating ears of leaf springs, etc.

 

2. Main Features

1. Using IGBT power devices and our company's second-generation converter control technology, the equipment has higher reliability and lower maintenance costs;

2. Full load continuous rate, 24 hours operation;

3. With constant current/constant power control function, the heating efficiency is higher;

4. Full display of output power, frequency and current;

5. The installation is simple, only need to connect electricity and water to use, no need to install by special personnel;

 

3. Installation method

1. Place the main and auxiliary machines: Generally, the main machine (operation control machine) is placed on the top, and the auxiliary machine (power output machine) is placed at the bottom.

2. Connect the water and electricity of the main and auxiliary machines: Use the two thin water pipes in the accessories to connect the waterway in a straight up and straight down way. Then use the two cables in the accessories, red to red and black to black to connect the circuit. It must be tightened, and there should be no poor contact. Connect the ground wire of the main and auxiliary machines.

3. Power connection: This machine is a three-phase power supply mode (380V), and the three red wires are respectively connected to a special three-phase switch or air switch (above 65A). Reconnect the ground wire.

4. Water connection: The cooling water pressure used by this machine is 0.1Mpa-0.3Mpa. Please choose a 1.1KW water pump and a water tank or pool (the water pump should be selected according to the length of the distance, and the larger water pump should be selected for the long distance; the volume should be selected according to the continuous working time and workload, and a small cooling tower can be installed if necessary). The water outlet of the pump is connected to the water inlet of the machine with a water pipe, and the water outlet of the machine returns the return water to the pool with a water pipe to realize water circulation cooling.

5) Install the induction coil: According to the shape and size of the heated metal workpiece, select, install and fix the induction coil. Note that the induction coil cannot be short-circuited.

6. Putting the workpiece: Put the workpiece to be heated into the center of the induction coil, the surrounding gap should be basically the same, and the workpiece and the induction coil should not touch.

 

4. Operation steps

1. Water: Start the water pump and observe whether the water flow at the water outlet is normal.

2. Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3. Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4. Start: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5. Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6. Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7. Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch at the rear of the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!

 

5. Maintenance

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

 
6. Technical parameters

model

RAC-120KW

Output Power

120KW

Input voltage

380v 50hz

Oscillation frequency

10-30khz

Pump Specifications

2.2kw

Cooling tower water flow

15T/Hour

pool

2cube

transformer

50KW

copper wire

50square

 

Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 欧美性吧 | 国产黑丝一区 | 久久久7777| 成年人黄网站 | 看黄免费网站 | 国产精品欧美亚洲 | 美女的胸给男人玩视频 | 免费成年人视频 | 特黄一区 | 精品国产一区二区在线 | 在线免费看毛片 | 91久久精品日日躁夜夜躁国产 | 重口另类 | 黄色免费网站 | 欧美日韩国产综合在线 | 欧美一区二区三区啪啪 | 中文字幕欧美在线 | 国产做受高潮 | 草草影院最新网址 | 网友自拍视频 | 成人av教育 | 欧美乱码精品一区二区 | 国产亚洲无| 亚洲一区电影 | 欧美色鬼| 无码熟妇αⅴ人妻又粗又大 | 欧美一区二区三区四区五区六区 | 日韩电影一区二区三区四区 | 久久五月激情 | 欧美三级视频在线播放 | 亚洲精选av| 中文字幕免费高清在线观看 | 亚洲永久免费视频 | 99综合视频 | 国产1区在线观看 | 九色porny自拍视频 | 美女高潮视频在线观看 | 日日网站 | 欧美精品第二页 | 性av网 | 久久中文字幕人妻 | 日本理论片在线 | 99久久亚洲精品 | 福利片一区二区 | 国产美女www爽爽爽视频 | 人人干网站 | 古代黄色片 | 狠狠插av| 国产在线看| av在线不卡观看 | 精品成人一区二区三区久久精品 | 青青草狠狠操 | 青青草91视频 | 午夜av网站| wwwjavhd| 97免费中文视频在线观看 | 亚洲视频在线免费 | 亚洲在线网站 | 99精品视频在线观看免费 | av一区不卡 | 久久久成人免费 | 天堂av一区二区 | 国产综合视频 | 国产吃瓜黑料一区二区 | 青娱乐国产在线 | 中文字幕在线视频一区 | 九九视频在线播放 | 国产a免费视频 | 96国产视频 | 99夜色 | 色综合中文 | 精品少妇人妻av一区二区三区 | 欧美拍拍| 日日噜噜夜夜狠狠久久丁香五月 | www.777奇米| 夜晚福利视频 | 亚洲一区二区三区在线 | 亚洲性色图| 女人高潮娇喘1分47秒 | 婷婷综合在线观看 | www.亚洲欧美 | 国产欧美在线观看视频 | 成人天堂av | 雪白的扔子视频大全在线观看 | 久久av免费看| 中文视频在线 | 91一起草 | 国产一区二区三区在线 | 日韩欧美国产另类 | 国产精品一区二区三区免费在线观看 | 日韩一及片 | 欧美aa级| 91免费影片| 色屋在线| 国模视频一区 | 三级亚洲 | 成年性生交大片免费看 | 在哪里可以看黄色片 | 日韩欧美视频一区 |